Resources

CONNECTIVITY GUIDE

Before you source the link

A speed and a connector are a starting point. Include the host and link details so the supplier can check the proposed item against your environment.

01

Start with the host

Switch or NIC manufacturer, exact model, port type and software version when relevant.

02

Define the connection

Required port speed, form factor, connector and whether the link is optical, DAC or AOC.

03

Describe the path

Distance or cable length, fibre type where applicable, and indoor or other operating conditions.

04

Share the procurement details

Quantity, delivery destination, target date and any required documentation.

05

Ask for confirmation

Have the supplier confirm the exact model, host compatibility, proposed testing and warranty scope before purchase.

Your enquiry checklist

Switch / NIC brand and model:
Software version (if relevant):
Port speed and form factor:
Connector:
Optical / DAC / AOC:
Fibre type and reach / cable length:
Operating environment:
Quantity:
Delivery destination and date:
Compatibility, testing and warranty confirmation required:

Discuss your requirements